Tuesday, 6 December 2011

First draft music video

This is the first draft of our music video that we have created, and already we have many ideas we wish to add to this project, such as take more scenes to create a story-line that is more solid than it currently is, and my partner and I have created a mood-board for the extra scenes we will need to add to our music video. We will also undertake a survey, and post it to social networking sites, so that we can get additional feedback.


Moodboard for final video scenes

Thursday, 24 November 2011

Outtakes and Test shots

The outtakes and test shots from our day of filming on Monday, 21st of November 2011 are all in this video.



Monday, 21 November 2011

21/11/2011

The big day had finally arrived, we filmed for our music video! OK, so we had some serious potential problems which could jeopardize our shoot and we had some actual problems which we needed to overcome.


To start with though, we contacted our lead actor Thomas Woolstoon and asked him to arrive at 12:30 PM so that we could begin filming with him before the problem of lighting which I will get on to later in this report. Our other leading actress, Lauren Gallagher would not be available until after 03:00 PM due to educational commitments (lessons). Therefore we decided that we should film Thomas' solo scenes first, then film the scenes with Lauren later on in the day.


We also enlisted the help of two of our peers in the sixth form in filming our video. Zeinab Jobber let us use her house nearby where we were filming to shoot the scene of Thomas inside the house, and also him leaving the house. We also got help from another student, Matthew Nguyen, who agreed to help us shoot our video due to having good experience with the camera we was using, the NIKON D90, and also having a lot of good previous knowledge in filming.


We finished filming our music video around 4:30 PM, in which we completed a huge majority of the scenes apart from the close-up guitar scene which we would film at a later date.


Now for the problems we faced.


Firstly, the weather could of been a problem. We, however did check the weather forecasts before hand and no rain was predicted, and thankfully the forecast was right. However, because we are shooting our video in late November, lighting could very well of been an issue because it gets very dark at an earlier time in the evening. Therefore we shot as much as we could outside before it became to dark to viably continue shooting our video outside. Me and my partner considered to continue filming in a nearby train station, however we decided against this due to potential problems with security issues. This meant we decided to film in a nearby tunnel which had more than sufficient lighting


Our first main problem came though when we discovered the tri-pod we was using did not work properly, so our footage would not be steady. My partner in this project also does Art, so he knew he could go to the art department in our college near to where we was filming and obtain another one. Moreover, we were told at late notice we could not use a dolly for our filming, so instead we had to just carry the camera ourselves when shooting tracking-shots. This may work to our advantage though as it gives the video a more realistic and grittier feel which suits the song we are making the music video for.


We also had to be aware of the amount of times we played the song out loud because the docking station we used to play the song used battery's, which we knew could run out and we didn't have any spare battery's on us to replace if we needed to. The battery on the camera we was using was also running out, so we had to be careful about the amount of shots we took.


We used the Nikon D90, iPod touch for the song, iPad for our storyboard and a tripod. We came to the conclusion that we were going to have to shoot the guitar close-up without Tom, because he didn't really know how to play the guitar. We asked Tom to actually sing, so that the negative lip synching mannerisms did not creep it, which worked really well, apart from the last scene.

Equipment: Tripod, Nikon D90, Guitar, Coins, Guitar Case, iPod, iPad, Docking Station, Mobile Phones and Coffee Cups

Thursday, 17 November 2011

Storyboard survey results


To make sure our storyboard was to a good standing, we asked people on to analyze the video, and give us possible suggestions. Some of the suggestions were unimportant with the genre of our music video, but one of them was vital, and helped us when it came to us changing our storyboard for our final product.

Final storyboard




This is the final draft of our storyboard, we have created this final storyboard based on the results of our survey.

Storyboard survey

http://kwiksurveys.com?s=LODJHI_4d205f69

This is the link to the survey regarding the storyboard.

Wednesday, 16 November 2011

Schedule


This is our schedule in which we have created for our music video process, all through the filming to the editing process so that we could keep to a set time. Our deadline for the first draft is the December 2nd 2011, but we aim to complete our final draft by that day. We will work hard to ensure we reach our self deadlines.

16/11/2011

Today I worked with Kay to ensure we completed our survey for our first draft storyboard, our final draft storyboard and also our schedule, and we are happy to say we have completed this.